We are well- equipped with good infrastructure for casting of the pipes. The pipes are manufactured and test of as per IS-458/2003 Standards. Furthermore, we are also backed by an extensive area of 4 Acres. Also, our manufacturing unit is equipped with latest machinery and modern technology which includes 1 Spinning units with EOT system. This has enabled us to produce an impressive amount of 260 meters / one day. We have a facility for manufacturing R.C.C. Spun Pipes of sizes from 150 mm dia to 1400 mm dia both NP3 & NP4 class. Pressure & Non Pressure pipes are also available.

WE HAVE ANOTHER 1 MANUFACTURING UNITS IN U. P.

  • Singh Spun Pipe Industries,
    Maigalganj Lakhimpur Kheri U.P.
Industrial plant at night
20+
Years of Experience

Salient Features

Our factory boasts ample curing tanks, conducts regular quality tests, and is equipped with advanced load-bearing, hydrostatic, and permeability testing facilities.
Quality Policy

For us, quality has always been the main priority and for this we follow various

Quality Control Measure

The pipes are made to IS 458-2003 and concrete mixing design is as per M-35 standard.

Raw Material Inspection

Raw materials such as cement, steel metal and sand are procured from established vendors. This raw materials are inspected before using in manufacturing of pipes.

Industrial plant at night

Concrete Cube Testing

  • Regularly concrete cube will be casted and tested by cube.
  • After pipes casting de molding is done after 24 hours and curing of pipes period takes 7 days.
  • Dimensions checks (i.e. pipes overall length, pipes internal diameter pipes barrel wall thickness) Dimensional tolerance as per 8.2 of IS 458-2003

Usage of R.C.C. Pipes

  • Road Crossing culverts and Pipe lines
  • Railway Bridges
  • Irrigation purposes
  • Strom water / sewerage drainage